Some writes up of standout projects we’ve recently worked on.
Renovation to Victorian townhouse. We took this property back to brickwork in each room (6 bedroom property) including bathrooms, upgrading insulation and restoring its original features.
We also installed a heated swimming pool and coordinated the landscaping.
The existing double garage was converted to a cinema room with a bathroom below.
This project required planning permission with local authority building control, the timeline was 12 months.
Large double storey extension constructed of SIPS Panels with a zinc standing seam roof and vertical larch cladding. The windows and doors are heritage aluminium including a beautiful corner window on the first floor.
There was extensive structural works to open up the existing property into the new extension.
Project length was 7 months.
Large single storey flat roof extension to the rear of the property, double storey extension to the side. New build garage with annex above. We created a beautiful new master bedroom with a large en-suite, kitchen dining area and indoor gym.
This was a fantastic project to be involved with, we were able to use reclaimed materials to ensure a good blend from old to new.
This was a 9 month project that required planning permission
Large flat roof extension creating a kitchen dining space, installation of crittal doors. We installed a beautiful rosewood real oak floor ontop of a wet underfloor heating system which looks great in conjunction with the doors.
This required planning permission with a project duration of 4 months.
Large double storey extension creating a new master bedroom with en-suite and kitchen dining area. This project included a few modifications to the existing house including re-plastering and redecorating.
The project duration was 7 months.
Interesting little project tucked away in Speldhurst. It was a conversion of an old plant room on the grounds of a listed property, in times gone-by larger houses would have a plantroom for storing a coal powered generator. We had the opportunity to convert this into a textile studio for the client.
As this was a listed property we needed to obtain the relevant permissions.
The project duration was 8 weeks.